Project · Austin area

Manholes set and adjusted to grade

Sewer and electric manholes set and brought to finished grade across several Austin-area jobs. Our crew sets the precast risers and cast-iron frames on line and grade, locks each frame in with a concrete collar, and raises lids to match new base and asphalt so they sit flush with the finished surface, in the right-of-way, beside sidewalks, and in the roadway.

Manholes set and adjusted to grade, manhole setting and adjustment near Austin, TX
TypeUtility structures: sewer and electric manholes
LocationAustin area, TX
ScopeSetting precast risers and frames, adjusting to grade, concrete collars, raising lids at paving, asphalt patching

Phase 01

Setting to grade

Precast risers and cast-iron frames are set on line and grade in the right-of-way, with the frame grouted to the riser before backfill.

Electric manhole lid set to grade in the right-of-way, with the crew and mini excavator working the corridor, manhole setting and adjustment near Austin, TX
Electric manhole lid set to grade in the right-of-way, with the crew and mini excavator working the corridor
Electric manhole frame and lid set at finished grade, manhole setting and adjustment near Austin, TX
Electric manhole frame and lid set at finished grade
Cast-iron frame grouted onto a precast riser before backfill, manhole setting and adjustment near Austin, TX
Cast-iron frame grouted onto a precast riser before backfill

Phase 02

Concrete collars

Each frame is locked in with a concrete collar, troweled smooth and sloped away from the lid.

Finished concrete collar around a manhole beside the frontage road, manhole setting and adjustment near Austin, TX
Finished concrete collar around a manhole beside the frontage road
Manhole collar finished next to the sidewalk, manhole setting and adjustment near Austin, TX
Manhole collar finished next to the sidewalk
Fresh collar placed around the frame, manhole setting and adjustment near Austin, TX
Fresh collar placed around the frame
Troweling the collar around a sewer manhole frame, manhole setting and adjustment near Austin, TX
Troweling the collar around a sewer manhole frame

Phase 03

Adjusting at paving

On paving jobs, manholes are raised to match the new base and asphalt, then patched in so the lid sits flush with the road.

Manhole raised to final grade in the new base, ahead of paving, manhole setting and adjustment near Austin, TX
Manhole raised to final grade in the new base, ahead of paving
Manhole lid flush with the new asphalt surface, manhole setting and adjustment near Austin, TX
Manhole lid flush with the new asphalt surface
Asphalt patched in around an adjusted manhole, with the plate compactor on site, manhole setting and adjustment near Austin, TX
Asphalt patched in around an adjusted manhole, with the plate compactor on site

Questions

Common questions

Do you set and adjust manholes?

Yes. We set precast risers and frames, adjust existing manholes to new grade, and place the concrete collars and asphalt patches around them.

Why do manholes need adjusting?

When a road is repaved, a sidewalk is added, or grade changes, the lid has to be raised or lowered so it sits flush with the finished surface. A lid left high or low is a trip and traffic hazard and lets water in.

Do you self-perform the work?

Yes. Excavation, setting, concrete collars, and backfill are done by our own crews and equipment.

How do you price manhole and utility work?

Every project is reviewed from the plans and walked onsite, then bid with an itemized fixed bid and one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.