Project · Downtown Austin
Excavation for new electrical conduit, downtown Austin
Trench excavation for new underground electrical conduit in a tight service alley in downtown Austin. We broke out the alley concrete, dug the trench with mini excavators, and broke through limestone with breaker hammers where the bucket couldn't. Where the route crossed existing water, gas, and other lines, the crew dug by hand to expose them and carried the new conduit runs underneath, working around building entrances, water meters, and active neighbors the whole time.

Phase 01
Breaking out the alley
The route was marked with utility locates before the concrete came up, then a mini excavator broke out the alley paving along the trench line.



Phase 02
Rock and tight spots
Downtown Austin sits on limestone. Where the excavator couldn't break it, the crew went in with breaker hammers, including tight spots next to the water meters and the building edge.


Phase 03
Crossing existing utilities
The new conduit had to pass under several live lines. The crew dug by hand to expose each one, kept them supported, and cleared room underneath for the conduit.



Phase 04
New conduit in the trench
Two new conduit runs are set on spacers along the trench, with sweeps where they turn up and the runs passing under the existing crossings.



Questions
Common questions
Do you dig trenches for electrical conduit?
Yes. In downtown Austin we excavated an alley trench for new electrical conduit, including concrete removal, rock breaking, and hand digging around existing utilities. Licensed electricians handle the electrical work.
Can you work in tight downtown alleys?
Yes. We use mini excavators and hand crews to work between buildings, keep entrances open, and stage material in narrow spaces.
How do you handle existing utilities?
Utilities are located and marked before we dig, and the crew hand excavates at every crossing to expose and protect live lines.
How do you price utility excavation?
Every project is walked onsite, then bid with an itemized fixed bid and one lump-sum total.