StealthGeneral Contracting
Call

Blog · October 28, 2026

Austin zoning facts: residential and commercial districts in plain English

Zoning tells you what you can build on a lot before any plan is drawn. Here is how Austin's residential and commercial districts are organized, what the common codes mean, and what changed under the HOME amendments.

How Austin zoning is organized

Austin has 16 residential, 13 commercial, 4 industrial, and 5 special-purpose base zoning districts. Each base district sets the allowed uses and the site development standards, such as lot size, height, setbacks, and impervious cover. The site regulations are in Land Development Code Section 25-2-492, and the City's Permitted Use Chart shows which uses each district allows (City of Austin zoning resources).

A zoning string can also include combining or overlay districts. The two you'll see most are MU (mixed use), which allows office, retail, and residential together, and CO (conditional overlay), which adds site-specific limits on uses or standards (City of Austin). Always read the full string, for example GR-MU-CO-NP, not just the base district.

Residential districts

DistrictWhat it's for
LA, RRLake Austin and rural residence, very large lots
SF-1Single-family large lot, 10,000 sq ft minimum lot (City zoning guide)
SF-2Single-family standard lot, 5,750 sq ft minimum (City zoning guide)
SF-3Family residence, 5,750 sq ft minimum, duplexes allowed (City zoning guide)
SF-4A, SF-4BSmall-lot single-family and condominium residence
SF-5, SF-6Urban family residence and townhouse/condominium
MF-1 to MF-6Multifamily, from limited density to highest density. MF-2 allows up to 23 units per acre and MF-3 up to 36 (City zoning guide)
MHMobile home residence

What HOME changed for single-family lots

Austin's HOME amendments changed what can be built in SF-1, SF-2, and SF-3 (City of Austin HOME amendments):

For custom homes, HOME means more lots can carry a main house plus one or two additional units, but the coverage and floor-area limits still shape the design. We work through those numbers during design-build before plans are drawn.

Commercial districts

DistrictWhat it's for
NO, LO, GONeighborhood, limited, and general office
LRNeighborhood commercial: small shops and services near homes
GRCommunity commercial: larger retail and services serving several neighborhoods
CRCommercial recreation
CS, CS-1General commercial services; CS-1 also allows liquor sales and cocktail lounges
CHCommercial highway
L, W/LOLake commercial and warehouse/limited office
CBD, DMUCentral business district and downtown mixed use

The industrial districts are IP, MI, LI, and R&D, and DR is development reserve (City of Austin zoning resources). The MU combining district can be added to NO, LO, GO, LR, GR, CS, and CS-1 to allow residential alongside commercial uses (City of Austin). For a tenant finish-out, the first check is whether your use, such as restaurant, medical office, or retail, is allowed in the space's district.

How rezoning requests are judged

If the current zoning doesn't fit, you can apply to rezone. The City evaluates requests against its zoning principles, including consistency with the Future Land Use Map or neighborhood plan, compatibility with nearby uses, transitions between zoning intensities, and avoiding spot zoning. More intensive zoning is generally steered toward intersections of arterial roads (City of Austin zoning principles).

Check before you buy or lease

Look up the exact zoning string on the City's property profile, read the site regulations in 25-2-492, and check the use chart for what you plan to do. Zoning rules change, so confirm current standards with Austin Development Services before you design.

Related services and guides

Questions

Common questions

What does SF-3 zoning mean in Austin?

SF-3 is Austin's family residence district. It has a 5,750 square foot minimum lot size, allows single-family homes and duplexes, and under the HOME amendments allows up to three housing units on a lot.

How many homes can I build on an SF-3 lot in Austin?

Under HOME Phase 1, up to three housing units are allowed on SF-1, SF-2, and SF-3 lots, with two- and three-unit projects limited to 40 percent building coverage and 45 percent impervious cover.

What is the difference between LR and GR zoning in Austin?

LR is neighborhood commercial, intended for small-scale shops and services near residential areas. GR is community commercial, which allows larger retail and service uses serving several neighborhoods.

What does MU mean in an Austin zoning string?

MU is a mixed-use combining district. Added to office or commercial districts like LO, GO, LR, GR, CS, or CS-1, it allows residential uses together with office and retail.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate