StealthGeneral Contracting
Call

Blog · October 28, 2026

Express permit, stand-alone permit, or full plan review? How Austin sorts residential projects

Not every Austin project needs the full residential plan review. Some small repairs qualify for an express permit that's usually issued in one business day. Others, like residential retaining walls, get a stand-alone permit. Here's how to tell which one you need.

Express permits: usually one business day

Austin's Residential Express Building Permits cover specific small projects on single-family, duplex, and two-family properties. Most are issued in one business day, though floodplain and historic district properties can take longer (City of Austin Express Permits). Qualifying work includes:

The catch: the express permit only covers work inside those limits. If the job grows, say you decide to move the sink or take out a wall, you need a full residential application and new fees, and the express fees aren't refunded (City of Austin). Decide the scope before you apply.

Stand-alone permits: retaining walls and trade-only work

For single-family properties, Austin issues stand-alone building permits for residential retaining walls, residential boat docks, and mobile homes, each with prerequisites. Stand-alone trade permits cover electrical, plumbing, mechanical, or irrigation work that isn't part of a building permit (City of Austin stand-alone permits). If trade work is tied to a larger construction project, it goes through Residential Plan Review instead.

Retaining walls are a big part of our work, from replacing failed walls to building new walls on hillside lots, and the engineering behind them is usually what the City's prerequisites ask for.

Full residential plan review: everything else

New homes, additions, interior remodels that move walls or plumbing, garage conversions, pools, decks, and demolition go through Residential Plan Review. The City's target review times range from 5 business days for interior remodels to 10 business days for new construction and additions (City of Austin Residential Plan Review). We cover that process in our step-by-step guide to Austin residential permits.

Who can pull the permit

A registered general contractor has to be linked to the building permit. In Texas anyone can be a general contractor, since no state license is required, and Austin lets homeowners register and act as the contractor for their own property (City of Austin Homeowner's Permit). Licensed electrical, plumbing, and HVAC work still goes to licensed trades. If you're not sure which path you're on, the City's free Development Process Team can walk you through it (Development Process Team), or you can call us.

Questions

Common questions

How fast is an Austin express permit?

Most Austin Residential Express Building Permits are issued in one business day. Properties in a floodplain or historic district can take longer.

Does a kitchen remodel need a permit in Austin?

Usually, yes. A kitchen remodel can qualify for an express permit if walls aren't moved or removed and plumbing fixtures aren't relocated or added. Moving walls or plumbing requires full residential plan review.

Do retaining walls need a permit in Austin?

Residential retaining walls on single-family properties can be permitted with a stand-alone building permit, which has prerequisites such as engineering.

Can I pull a permit as a homeowner in Austin?

Yes. Austin lets homeowners register as the general contractor for their own property. Texas does not require a state general contractor license.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate